Environmental Impact Assessment for the Aluminium and Zinc Recycling Plant at Kuala Langat, Selangor
|
Astana Asia Timur Sdn. Bhd.
|
|
2001
|
Environmental Monitoring for the Development of Bandar Enstek, Seremban, Negeri Sembilan
|
TH-NSTC Sdn. Bhd.
|
|
2001
|
Strategic Environmental Assessment for the ‘Masterplan for Sustainable Development at Berjuntai Bestari, Selangor’
|
AJM Urban & Design Group Sdn. Bhd.
|
|
2001
|
Environmental Management Plan for the Proposed Mixed Development at Kota Pendamar Indah, Klang, Selangor
|
Banjaria Sdn. Bhd.
|
|
2001
|
Environmental Impact Assessment for the Proposed Penang 2nd Crossing, Marine Ecology
|
Environmental Asia Sdn. Bhd.
|
|
2001
|
Proposed Development for Al-Bukhary Centre, Jalan Langgar, Mukim Langgar, Alor Setar, Kedah
|
Zelan Construction Sdn. Bhd.
|
EMP & EM
|
2001
|
Aluminium and Zinc Recyling Plant, Kuala Langat, Selangor
|
Astana Asia Timur Sdn. Bhd.
|
EIA
|
2001
|
Environmental Management Plan and Environmental Monitoring for the Proposed Development of Al-Bukhary Centre, Alor Setar, Kedah
|
Zelan Construction Sdn. Bhd.
|
|
2001
|
Proposed Penang 2nd Crossing, Marine Ecology
|
Environmental Asia Sdn. Bhd.
|
EIA
|
2001
|
Proposed Mixed Development, Kota Pendamar Indah, Klang
|
Banjaria Sdn. Bhd.
|
EMP
|
2001
|
Master Plan for Sustainable Development, Berjuntai Bestari, Batang Berjuntai, Selangor
|
AJM Urban & Design Group Sdn. Bhd.
|
SEA
|
2001
|
Development Of Bandar Enstek, Mukim Labu,Seremban, Negeri Sembilan
|
TH-NSTC Sdn. Bhd.
|
EM
|
2001
|
CF Beloga Recycling Plant, Meru, Klang
|
Beloga Sdn. Bhd.
|
EIA
|
2002
|
Environmental Assessment for the Siting of Melalap Oil Mill, Tenom, Sabah
|
Golden Hope Plantations (Peninsular) Sdn. Bhd.
|
|
2002
|
Environmental Impact Assessment for CF Beloga Recycling Plant at Meru, Selangor
|
Beloga Sdn. Bhd.
|
|
2002
|
Sg. Melaka Rehabilitation and Beautification Project
|
SMHB Sdn. Bhd.
|
EIS & EIA
|
2002
|
Siting of Melalap Oil Mill, Tenom, Sabah
|
Golden Hope Plantations (Peninsular) Sdn. Bhd.
|
EA
|
2002
|
Design and Build Tender for Beach Nourishment and Coastal Protection Works (Package 6) for Navigation Requirements Tg. Rhu, Langkawi
|
Tidalmarine Engineering Sdn. Bhd.
|
EMP, EM & A
|
2002
|
Environmental Management Plan and Environmental Monitoring & Auditing for the Design and Build Tender for Beach Nourishment and Coastal Protection Works (Package 6) for Navigation Requirements, Tanjung Rhu, Langkawi, Kedah
|
Tidalmarine Engineering Sdn. Bhd.
|
|
2002
|
Environmental Impact Assessment for the Sungai Melaka Rehabilitation and Beautification Project, Melaka
|
SMHB Sdn. Bhd.
|
|
2002
|
Land Reclamation Project, Phase 1, Tg. Tokong, Penang
|
Tidalmarine Engineering Sdn. Bhd.
|
EMP & EM & A
|
2003
|
Environmental Management Plan and Environmental Monitoring & Auditing for the Proposed Land Reclamation Project (Phase 1) at Tanjung Tokong, Penang
|
Tidalmarine Engineering Sdn. Bhd.
|
|
2003
|
Environmental Management Plan and Environmental Monitoring & Auditing for Tanjung Pinang Mixed Development (Phase 1), Penang
|
E&O Property (Penang) Sdn. Bhd.
|
|
2004
|
Tg. Pinang Mixed Development (Phase1), Pulau Pinang
|
E&O Property (Penang) Sdn. Bhd.
|
>EMP & EM & A
|
2004
|
Sediment Disposal at Sg. Jasin/Jasik, Cameron Highlands, Pahang
|
Sei Meraga Construction Sdn. Bhd.
|
EMP
|
2004
|
Environmental Management Plan for the Proposed Rehabilitation of Ringlet Reservoir, Cameron Highlands, Pahang
|
Tidalmarine Engineering Sdn. Bhd.
|
|
2004
|
EMP for Sediment Disposal at Sungai Jasin/Jasik, Cameron Highlands, Pahang
|
|
|
2004
|
Proposed Rehabilitation of Ringlet Reservoir, Cameron Highland, Pahang
|
Tidalmarine Engineering Sdn. Bhd.
|
EMP
|
2004
|
Environmental Management Plan and Environmental Monitoring & Auditing for the Proposed Rehabilitation of Ringlet Reservoir, Cameron Highlands, Pahang
|
Tidalmarine Engineering Sdn. Bhd.
|
|
2005
|
Proposed Kota Air Project (Phase 1) at Pasir Putih, Pasir Gudang, Johor
|
TPM Technopark Sdn. Bhd.
|
EIA
|
2005
|
Proposed Rehabilitation of Ringlet Reservoir, Cameron Highland
|
Tidalmarine Engineering Sdn. Bhd.
|
EM&A
|
2005
|
Environmental Impact Assessment for the Proposed Kota Air Project (Phase 1) at Pasir Putih, Pasir Gudang, Johor
|
TPM Technopark Sdn. Bhd.
|
|
2005
|
Mapping Environmentally Sensitive Area for Kemesah Height, Hulu Kelang
|
E&O Property Development Berhad
|
EIA
|
2006
|
Proposed Aluminium Smelting Plant in Similajau, Bintulu, Sarawak
|
Jurutera Perunding Wahba Sdn. Bhd.
|
TOR
|
2006
|
Environmental Management Plan for ‘Projek Lebuhraya Pantai Timur II (Pakej 2), Kemaman, Terengganu’
|
Koperasi Belia Nasional Berhad (Kobena)
|
|
2006
|
Terms of Reference for the Proposed Aluminum Smelting Plant in Similajau, Bintulu, Sarawak
|
Jurutera Perunding Wahba Sdn. Bhd.
|
|
2006
|
Environmental Impact Assessment for Mapping Environmentally Sensitive Area for Kemensah Heights, Hulu Kelang, Selangor
|
E&O Property Development Berhad
|
|
2006
|
Environmental Management Plan for ‘Projek Lebuhraya Pantai Timur II (Pakej 2), Kemaman, Terengganu ’
|
Koperasi Belia Nasional Berhad (Kobena)
|
|
2006
|
Environmental Management Plan for ‘Kerja -kerja Pengerukan di Kuala Sungai Muar, Johor ’
|
ZnK Consult
|
|
2006
|
Environmental Impact Assessment for the Proposed Expansion of North Butterworth Container Terminal (Phase 3), Penang
|
Penang Port Sdn. Bhd.
|
|
2006
|
Environmental Impact Assessment for the Proposed Penang Second Crossing
|
UEM Builders Sdn. Bhd.
|
|
2006
|
Environmental Management Plan for ‘Kerja-kerja Pengerukan di Kuala Sungai Muar, Johor’
|
ZNK Consult
|
|
2006
|
Proposed Penang Second Crossing
|
UEM Builders Berhad
|
EIA
|
2006
|
Proposed Expansion of North Butterworth Container Terminal (NBCT), Phase 3, Pulau Pinang
|
Penang Port Sdn. Bhd.
|
EIA
|
2006
|
Projek Lebuhraya Pantai Timur II (Pakej 2), Kemaman, Terengganu
|
Koperasi Belia Nasional Berhad (KOBENA)
|
EMP
|
2006
|
Kerja-Kerja Pengerukan di Kuala Sg. Muar, Johor Darul Takzim
|
ZnK Consult Sdn. Bhd.
|
EMP
|
2006
|
Environmental Impact Assessment for the Proposed Expansion of Kuala Prai Terminal, Penang
|
Penang Port Sdn. Bhd.
|
|
2007
|
Kerja-Kerja Pengerukan di Sg. Johor, Daerah Kota Tinggi untuk Membaiki Kerosakan Akibat Banjir
|
Malaysian Maritime Derdging Corporation (MMDC) Sdn. Bhd.
|
EMP,EA,EM&A
|
2007
|
Proposed Construction of Marina at The Rivermouth of Sg. Melaka
|
MRCB Engineering Sdn. Bhd.
|
EA
|
2007
|
Tg. Pinang Land Development Project (Phase 2), Pulau Pinang
|
E&O Property Development Berhad
|
Detailed EIA,EM&A
|
2007
|
Proposed Sand Sourcing Off The Coast Of Perak
|
Bintang Logam Sdn. Bhd.
|
EIA
|
2007
|
Projek Pembinaan Jeti Operasi Wilayah Laut III, Tg. Gerak, Langkawi, Kedah
|
Rimba Ramin Sdn. Bhd.
|
EMP,EM&A
|
2007
|
Proposed Expansion of Prai Bulk Cargo Terminal (PBCT), Pulau Pinang
|
Penang Port Sdn. Bhd.
|
EIA
|
2007
|
Proposed Expansion of Tg. Langsat Port, Johor
|
Johor Corporation Berhad
|
EIA & EMP
|
2007
|
Projek Lebuhraya Pantai Timur Fasa 2 (Pakej 3), Kemaman, Terengganu
|
Tidalmarine Engineering Sdn. Bhd.
|
EM&A
|
2007
|
Proposed Offshore Derdging Sg. Udang, Melaka
|
Extorisch Sdn. Bhd.
|
EIA & EMP
|
2007
|
Environmental Management Plan & Environmental Monitoring and Auditing for ‘Projek Pembinaan Jeti Operasi Wilayah III, Langkawi, Kedah
|
Rimba Ramin Sdn. Bhd.
|
|
2007
|
Environmental Impact Assessment and Environmental Management Plan for the Proposed Expansion of Tanjung Langsat Port, Johor
|
Johor Corporation
|
|
2007
|
Environmental Monitoring and Auditing for ‘Projek Lebuhraya Pantai Timur Fasa 2 (Pakej 3), Kemaman, Terengganu ’
|
Tidalmarine Engineering Sdn. Bhd.
|
|
2007
|
Environmental Impact Assessment and Environmental Management Plan for the Proposed Offshore Dredging, Sungai Udang, Melaka
|
Extrorich Sdn. Bhd.
|
|
2007
|
Environmental Assessment for the Proposed Construction of Marina at the River Mouth of Sungai Melaka
|
MRCB Engineering Sdn. Bhd.
|
|
2007
|
Detailed Environmental Impact Assessment and Environmental Monitoring & Auditing for the Proposed Seri Tanjung Pinang Land Development Project (Phase 2), Penang
|
E&O Property Development Berhad
|
|
2007
|
Environmental Assessment, Environmental Management Plan and Environmental Monitoring and Auditing for ‘Kerja -kerja Pengerukan di Sungai Johor, Kota Tinggi Untuk Membaiki Kerosakan Akibat Banjir ’, Johor
|
Malaysian Maritime & Dredging
Corporation Sdn. Bhd. Environmental
Services
Penang Port
|
|
2007
|
Environmental Impact Assessment for the Proposed Sand Sourcing off the Coast of Perak
|
Bintang Logam Sdn. Bhd.
|
|
2007
|
Environmental Monitoring and Auditing for ‘Projek Lebuhraya Pantai Timur Fasa 2 (Pakej 3), Kemaman, Terengganu’
|
Tidalmarine Engineering Sdn. Bhd.
|
|
2007
|
Environmental Assessment, Environmental Management Plan and Environmental Monitoring and Auditing for ‘Kerja-kerja Pengerukan di Sungai Johor, Kota Tinggi Untuk Membaiki Kerosakan Akibat Banjir’, Johor
|
Malaysian Maritime & Dredging
Corporation Sdn. Bhd.
|
|
2007
|
Proposed Sand Filling, Dredging and Berthing Facilities at Tg. Langsat Industrial Complex, Johor
|
Tanjung Langsat Port Sdn. Bhd.
|
EIA
|
2008
|
Environmental Management Plan and Environmental Monitoring & Auditing for ‘Merekabentuk dan Kerja-kerja Mendalamkan Muara Sungai Kedah di Kompleks LKIM, Kuala Kedah’
|
Malaysian Maritime & Dredging
Corporation Sdn. Bhd.
|
|
2008
|
Proposed Penang Second Bridge Project
|
CHEC Construction (M) Sdn. Bhd.
|
EM&A
|
2008
|
Merekabentuk dan Kerja-Kerja Mendalamkan Muara Sg. Kedah di Kompleks LKIM Kuala Kedah
|
MMDC Sdn. Bhd.
|
EMP & EM&A
|
2008
|
Environmental Management Plan and Environmental Monitoring & Auditing for ‘Merekabentuk dan Kerja -kerja Mendalamkan Muara Sungai Kedah di Kompleks LKIM, Kuala Kedah ’
|
Malaysian Maritime & Dredging
Corporation Sdn. Bhd.
|
|
2008
|
Environmental Monitoring and Auditing for the Proposed Penang Second Bridge Project
|
CHEC Construction (M) Sdn. Bhd.
|
|
2008
|
Environmental Impact Assessment for the Proposed Sand Filling, Dredging and Berthing Facilities at Tanjung Langsat Industrial Complex, Johor
|
Tanjung Langsat Port Sdn. Bhd.
|
|
2008
|
Pembinaan Kompleks Kementerian Dalam Negeri
|
Asas Meranti TME JV Sdn. Bhd.
|
EMP & EM&A
|
2009
|
Environmental Impact Assessment for the Proposed Sand Mining at the Coast of the State of Perak
|
Alligence Systems Sdn. Bhd.
|
|
2009
|
Water Quality Monitoring for ‘Perkhidmatan Persampelan dan Analisis Air di Selatan Laut China Selatan ’
|
Universiti Kebangsaan Malaysia
|
|
2009
|
Water Quality Monitoring for ‘Perkhidmatan Persampelan dan Analisis Air di Selatan Laut China Selatan’
|
Universiti Kebangsaan Malaysia
|
|
2009
|
Environmental Management Plan and Environmental Monitoring and Auditing for ‘Pembinaan Kompleks Kementerian Dalam Negeri (KDN), Wilayah Persekutuan Kuala Lumpur’
|
Asas Meranti - TME JV Sdn. Bhd.
|
|
2009
|
Environmental Management Plan and Environmental Monitoring and Auditing for ‘Pembinaan Kompleks Kementerian Dalam Negeri (KDN), Wilayah Persekutuan Kuala Lumpur ’
|
Asas Meranti - TME JV Sdn. Bhd.
|
|
2009
|
The Proposed Sand Mining at The Coast of The State of Perak Darul Ridzuan
|
Alligence Systems Sdn. Bhd.
|
EIA
|
2009
|
Environmental Management Plan and Environmental Monitoring for the Proposed Dredging Works at Kuala Perlis, Perlis
|
ZnK ConsultEnvironmental monitoring for
Penang Second Bridge project
Lebuhraya Pantai Timur Fasa 2
|
|
2010
|
Environmental Management Plan the Proposed Detailed Design and Supervision Works for the Proposed Marine Fish and Shrimp Hatchery Centre in Merchong, Pekan, Pahang
|
Norzakiah Architect
|
|
2010
|
Water Quality Monitoring for ‘Kerja -kerja Pengerukan, Pengangkutan dan Pelupusan Selut bagi Pembinaan S wing Bridge di Sungai Prai, Pulau Pinang ’
|
Tidalmarine Engineering Sdn. Bhd.
|
|
2011
|
Environmental Assessment for ‘Merekabentuk, Membina dan Menyiapkan Rancangan Tebatan Banjir di Sungai Muda (Bahagian Hilir), Pakej 2, Kedah ’
|
JPS/Redmax Sdn. Bhd.
|
|
2011
|
EMP for the Detailed Design and Supervision Works for the Proposed Tok Bali Integrated Fisheries Park (Phase 1) in Pasir Puteh, Kelantan
|
Ariffin Architect
|
|
2011
|
Environmental Impact Assessment for the Proposed Capital Dredging at Tanjung Langsat Port, Johor
|
Tanjung Langsat Port Sdn. Bhd.
|
|
2011
|
Water Quality Monitoring for ‘Kerja-kerja Pengerukan, Pengangkutan dan Pelupusan Selut bagi Pembinaan Swing Bridge di Sungai Prai, Pulau Pinang’
|
Tidalmarine Engineering Sdn. Bhd.
|
|
2011
|
Water Quality Monitoring Report for MalaysiaSingapore Joint Committee on Environment (MSJCE)
|
Universiti Kebangsaan Malaysia
|
|
2011
|
Environmental Assessment for ‘Merekabentuk, Membina dan Menyiapkan Rancangan Tebatan Banjir di Sungai Muda (Bahagian Hilir), Pakej 2, Kedah’
|
JPS/Redmax Sdn. Bhd.
|
|
2011
|
Water Quality Monitoring Report for MalaysiaSingapore Joint Committee on Environment (MSJCE)
|
Universiti Kebangsaan Malaysia
|
|
2011
|
Water Quality Monitoring Report for Malaysia - Singapore Joint Committee on Environment (MSJCE)
|
Universiti Kebangsaan Malaysia
|
|
2011
|
Environmental Monitoring and Audit Report for the Proposed Residential Development on Part of Lot 3799 and Lot 3800, Mukim Ijok, Kuala Selangor, Selangor
|
Glomac Consolidated Sdn. Bhd.
|
|
2012
|
Supplementary EIA for the Proposed Capital Dredging at Tg. Langsat Private Jetty, Johor
|
Tanjung Langsat Port Sdn. Bhd.
|
|
2012
|
Environmental Monitoring and Audit Report for the Proposed Residential Development on Part of Lot PT 837 (200 Acres), Ijok Selangor
|
Regency Land Sdn. Bhd.
|
|
2012
|
Environmental Impact Assessment for the Proposed Sand Mining Off the Coast of Pahang
|
Syarikat Kenyalang Marine Engineering
Sdn. Bhd.
|
|
2012
|
Detailed Environmental Impact Assessment for the Proposed Coastal Expressway, Penang
|
Jambatan Kedua Sdn. Bhd.
|
|
2012
|
Environmental Impact Assessment for the Proposed Sand Mining at Sungai Lebam, Johor
|
Hitech Sdn. Bhd.
|
|
2012
|
Detailed Environmental Impact Assessment for the Construction of New Township Nusajaya West (Gerbang Nusajaya), Johor
|
UEM Land Sdn. Bhd.
|
|
2012
|
Detailed Environmental Impact Assessment for Phase III Dredging and Reclamation Works at Pelabuhan Tanjung Pelepas, Johor
|
Pelabuhan Tanjung Pelepas Sdn. Bhd.
|
|
2012
|
Environmental Impact Assessment for Pulau Kuching Integrated Maintenance Base (PKIMB), Kemaman, Terengganu
|
Meos Offshore Services Sdn. Bhd.
|
|
2013
|
Construction of Load Out Jetty at Lot 6002 (PTD 1603), Tanjung Kupang, Johor
|
Dyna -Mac Engineering Services Sdn. Bhd.
|
|
2013
|
Environmental Monitoring for River Channelization Works of Sungai Tembusu, Tanjung Bin, Johor
|
Tidalmarine Engineering Sdn. Bhd.
|
|
2013
|
Preliminary Environmental Impact Assessment for the Proposed Development of Kuantan Waterfront Resort City—Phase 1 & 2, Pahang
|
Ideal Heights Development Sdn. Bhd.
|
|
2013
|
Environmental Impact Assessment for the Proposed Industrial Park at Gerbang Nusajaya, Nusajaya, Johor
|
Ascendas Land (M) Sdn. Bhd.
|
|
2013
|
Preliminary Environmental Impact Assessment for the Proposed Development of Kuantan Waterfront Resort City —Phase 1 & 2, Pahang
|
Ideal Heights Development Sdn. Bhd.
|
|
2013
|
Environmental Impact Assessment for the Proposed Sand Mining at Penyabong
|
Harapan Merdeka Sdn. Bhd.
|
|
2013
|
Environmental Management Plan for the Proposed Construction of UiTM Raub Campus, Pahang
|
Azimat Eureka Sdn. Bhd.
|
|
2013
|
Detailed Environmental Impact Assessment Study for the Proposed Berjaya Waterfront Development, Johor Bahru, Johor
|
Jauhari Maksima Sdn. Bhd.
|
|
2014
|
Detailed Environmental Impact Assessment for the Proposed Reclamation Works for Forest City Development, Johor Bahru, Johor
|
Country Garden Pacificview Sdn. Bhd.
|
|
2014
|
Detailed Environmental Impact Assessment Study for the Proposed Eco Friendly Caviar Aquaculture at Kuala Tahan, Pahang
|
Felda Caviartive Sdn. Bhd.
|
|
2014
|
Detailed Environmental Impact Assessment for the Proposed Reclamation of Seri Tanjung Pinang (Phase II) Development (STP2), Penang
|
Tanjung Pinang Development Sdn. Bhd.
|
|
2014
|
Environmental Management Plan and Implementation of Environmental Monitoring Programme during Operation and Maintenance of Sultan Abdul Halim Mu'adzam Shah Bridge, Penang
|
Jambatan Kedua Sdn. Bhd.
|
|
2014
|
Detailed Environmental Impact Assessment for the Proposed Reclamation for Rungkup Port City, Perak
|
Perbadanan Kemajuan Negeri Perak
|
|
2014
|
Detailed Environmental Impact Assessment for the Proposed Reclamation Works for Perak Eco Industrial Hub at Bagan Datoh, Perak
|
PECOH Industrial Development Sdn. Bhd.
|
|
2014
|
Detailed Environmental Impact Assessment for the Proposed Reclamation Works of R&F Tanjung Puteri, Johor Bahru, Johor
|
R&F Development Sdn. Bhd.
|
|
2014
|
Environmental Management Plan for the Proposed Motorsports City Development in Gerbang Nusajaya, Johor
|
Fastrack Iskandar Sdn. Bhd.
|
|
2014
|
The Proposed Reclamation at the South of Penang
|
SRS Consortium
|
|
2015
|
Pre-Environmental and Socio -economic Impact Assessment for Crude Oil Refinery at Northwest Malaysia
|
Amec Foster Weeler
|
|
2015
|
Detailed Environmental Impact Assessment for the Proposed Selat PD Reclamation Works, Negeri Sembilan
|
Ekovest Berhad
|
|
2015
|
Detailed Environmental Impact Assessment for the Proposed Reclamation of 643 ha of Coastline along Butterworth, Seberang Perai Utara, Penang
|
Rayston Consortium (Butterworth) Sdn.
Bhd.
|
|
2015
|
Preliminary Environmental Impact Assessment for the Proposed Development of Tok Bali Supply Base at Kampung Tok Bali, Semerak, Pasir Puteh, Kelantan
|
TB Supply Base Sdn. Bhd.
|
|
2015
|
Environmental Impact Assessment for the Proposed “Projek Pemuliharaan Muara Sungai Besut”
|
Jabatan Pengairan & Saliran Malaysia
|
|
2015
|
Environmental Impact Assessment (2nd Schedule) for Danga Bay Reclamation Works, Johor
|
Iskandar Waterfront Sdn. Bhd.
|
|
2015
|
Pre-Environmental and Socio-economic Impact Assessment for Crude Oil Refinery at Northwest Malaysia
|
Amec Foster Weeler
|
|
2015
|
Environmental Impact Assessment for the Proposed “Projek Pemuliharaan Muara Sungai Besut ”
|
Jabatan Pengairan & Saliran Malaysia
|
|
2015
|
Environmental Impact Assessment for the Proposed Sand Mining at Offshore Lumut
|
Neuvinas Sdn. Bhd.
|
|
2015
|
Environmental Impact Assessment (1st Schedule) for the Proposed Upgrading Works for Kuala Sawah Regional Sewage Treatment Plant (SEN 330), Negeri Sembilan
|
Brilliant Logic Sdn. Bhd.
|
|
2016
|
Environmental Impact Assessment (1st Schedule) for the Development of Industrial, Commercial & Inland Port Terminal at Lembah Chuping, Perlis
|
PIP Sempadan Utara Sdn. Bhd.
|
|
2016
|
Environmental Impact Assessment (1st Schedule) for the Proposed Housing, Industrial & Commercial Development at Ladang Air Manis, Johor
|
Teon Choon Realty Company Sdn. Bhd.
Sultan Abu Bakar Bridge, Pahang
Sungai Paka, Terengganu
|
|
2016
|
Environmental Impact Assessment (1st Schedule) for the Proposed Kedah Rubber City Development, Kedah
|
North Corridor Economic Region (NCER)
|
|
2017
|
Environmental Monitoring for the Proposed Construction of IPD Complex Off Jalan Travers, Kuala Lumpur
|
Primamuda Holdings Sdn. Bhd.
|
|
2017
|
Environmental Impact Assessment (1st Schedule) for the Proposed Township Development on Lot 3910, Sepang, Selangor
|
APUDG Sdn. Bhd.
|
|
2017
|
Environmental Management Plan for the Proposed Development of Solar Farm in Merchang, Terengganu
|
Solartif Sdn. Bhd.
|
|
2017
|
Environmental Management Plan, Emergency Response Plan & Environmental Monitoring for Phase III Dredging & Reclamation Works at Pelabuhan Tanjung Pelepas, Johor
|
Pelabuhan Tanjung Pelepas Sdn. Bhd.
|
|
2017
|
Environmental Impact Assessment (Additional Information) for Phase III Dredging & Reclamation Works at Pelabuhan Tanjung Pelepas, Johor
|
Pelabuhan Tanjung Pelepas Sdn. Bhd.
|
|
2017
|
EMP for Construction of the Proposed Bridges of Seri Tanjung Pinang Phase II (STP2) Development, Penang.
|
Tanjung Pinang Development Sdn. Bhd.
|
|
2018
|
Environmental Impact Assessment (1st Schedule) for Proposed Residential Development at Taman Kelab Ukay, Gombak, Selangor
|
Lembah Langat Development Sdn. Bhd.
|
|
2018
|
Environmental Impact Assessment (1st Schedule) for Proposed Jetty Head Extension (North) at Swettenham Pier Cruise Terminal (SPCT), Georgetown, Pulau Pinang
|
Penang Port Sdn. Bhd.
Artist’s impression of Penang South Reclamation Scheme
Development of Residential South at Puteri Harbour
|
|
2018
|
Environmental Impact Assessment (1st Schedule) for Proposed Mixed Development in Ladang Penawar, Kota Tinggi, Johor
|
Ladang Petri Tenggara Sdn. Bhd.
|
|
2018
|
Environmental Impact Assessment (1st Schedule) for Proposed Dredging Works at Sungai Kelantan River Mouth, Kuala Besar, Kelantan
|
Goldland Capital Sdn. Bhd.
|
|
2018
|
Environmental Impact Assessment (1st Schedule) for Proposed Serkat Industrial Development Pontian, Johor
|
Jentayu Pedoman Sdn. Bhd.
|
|
2018
|
Environmental Impact Assessment (1st Schedule) for Proposed Housing, Industrial & Commercial Development at Ladang Air Manis, Johor
|
Teon Choon Realty Company Sdn. Bhd.
|
|
2018
|
Proposed Dredging Works as Part of Sungai Paka Rivermouth Conversation Projects, Terengganu
|
Jabatan Pengairan dan Saliran
|
|
2019
|
Relocation of Existing Coal Fly & Bottom Ash at Sultan Salahuddin Abdul Aziz Power Station, Kapar, Selangor
|
Kapar Energy Ventures Sdn Bhd
|
|
2019
|
Establishment of EIA Guidelines for irrigation and Drainage Dam Construction, Water Supply and Power Generation and Transmission Activities
|
Jabatan Alam Sekitar
|
|
2019
|
Proposed Development of Residential South at Puteri Harbour, Iskandar Puteri, District of Johor Bahru, Johor
|
Nusajaya Premier Sdn Bhd
|
|
2019
|
Proposed Construction of Ulu Jelai Hydroelectric Project (UJHEP) Re -Regulating Weir, Lipis, Pahang
|
Tenaga Nasional Berhad
|
|
2019
|
Gerbang Nusajaya Common Infrastructure Works (Phase 1&2) Johor
|
Nusajaya Rise Sdn Bhd
|
|
2019
|
East Cendor Phase 1 Development Project
|
Petrofac (PM -304) Limited
|
|
2020
|
Proposed Development at Gertak Sanggul, Pulau Pinang
|
Emerald Designs Sdn. Bhd.
|
|
2020
|
3R Policy Preparation (Reduce, Reuse, Recycle) for Shah Alam City Council
|
Majlis Bandaraya Shah Alam
|
|
2020
|
Gurney Wharf Development Project, Gurney Drive, North East District, Penang
|
Setiausaha Kerajaan Negeri Pulau Pinang
|
|
2020
|
Hydraulic Study and Environmental Impact Study (EIA) in the Area: (A) Sultan Abu Bakar Bridge at Kuala Pahang Estuary, Pekan Pahang. (B) Tanjung Agas, Pekan Pahang
|
Pengurusan Pasir Pahang
Proposed Berjaya Waterfront
Development
|
|
2020
|
Proposed Development at Kemensah, Hulu Kelang, Selangor
|
Kayangan Budaya Sdn Bhd
|
|
2020
|
Pembinaan Ramp/ Flyover Sepanjang 300m Dari Jalan P15H Ke Persiaran Timur Bagi Tujuan Penyuraian Trafik
|
Derrida (M) Sdn. Bhd.
|
|
2021
|
Cadangan Pembinaan dan Pembangunan Kompleks Ibu Pejabat Agensi Penguatkuasaan Maritim Malaysia (APMM) & Pejabat Maritim Negeri (MN) Selangor di atas Lot 185740 (No. Lot Lama 87162), Pulau Indah, Selangor
|
Nautica East Sdn. Bhd.
|
|
2021
|
Proposed Sand Mining Works at Kuala Besar Rivermouth, Kelantan
|
Sand Stone Dredging Sdn. Bhd.
|
|
2021
|
Dredging Works at Pasir Puteh Jetty, Tok Bali, Kelantan
|
Sterling East Sdn. Bhd.
|
|
2021
|
Proposed Project Penang South Reclamation Scheme
|
SRS Consortium Sdn. Bhd.
|
|
2021
|
Proposed Construction of Temporary Coastal Protection Structure for Phase 2B and Part of Phase 2C of Reclamation for Seri Tanjung Pinang (Phase II) Development (STP2) Project at Tanjung Tokong, Penang
|
Kerjaya Prospek (M) Sdn. Bhd.
Environmental
Services
|
|
2021
|
Execution and Completion of Sewerage Treatment Plant (Moving Bed Biofilm Rector (MBBR) System) and All Associated Works on Plot 20 and Infrastructure works Comprising Roadside Surface Water Drainage and Sewerage Reticulation System for the Proposed Seri Tanjung Pinang Phase 2A Development (STP2), Daerah Timur Laut, Pulau Pinang
|
Kerjaya Prospek (M) Sdn. Bhd.
|
|
2021
|
Penang Transport Masterplan: Fisherman Taskforce Activities for PSR Ecology Offset Masterplan (PEOM)
|
SRS Consortium
|
|
2021
|
Membina Baharu Kompleks Ehsan Slim River, Perak
|
Jabatan Kerja Raya
|
|
2021
|
Proposed of the Langkasuka Developmeny (Phase 1) on PT 651 and PT 652 (Formerly Lot 978), Seksyen 4, Bandar Padang Mat Sirat, Pulau Langkawi, Kedah Darul Aman
|
Widad Business Group Sdn. Bhd.
|
|
2021
|
Pembinaan Takungan Air Pinggiran Sungai (TAPS) Melaka
|
Kementerian Alam Sekitar dan Air
(Bahagian Bekalan Air)
|
|
2021
|
Consultancy services for the Proposed Development of a Permanent Disposal Facility (PDF) for the water Leach Purification (WLP) Residue on Lot 31375, Gebeng Industrial Estate (GIE), Mukim Sungai Karang, Kuantan, Pahang
|
Gading Senggara
|
|
2021
|
Cadangan Pembangunan Bercampur (Pelabuhan Antarabangsa Serbaguna Laut Dalam dan Terminal Antarabangsa Cruise) secara Penambakan Laut berkeluasan 1190 ekar tanah kerajaan kawasan laut Pulau Melaka di atas Plot 1 Bandar Melaka K.B. XLIII & Plot 2 Bandar Melaka K.B. XLVI Daerah Melaka Tengah, Melaka
|
Far East (Melaka) Sdn. Bhd.
|
|
2021
|
Kajian Analisis Beban Pencemar Udara di Kawasan Industri Berisiko di Malaysia
|
Jabatan Alam Sekitar Putrajaya
|
|
2021
|
Cadangan Pelan Induk Pembangunan Bercampur Kuantan Laguna Resort City (KLR) Secara Tebus Guna / Penambakan Tanah Di Atas Tanah Kerajaan Seluas 572.631 Hektar (1,415 Ekar) Di Tanjung Lumpur, Bandar Kuantan, Daerah Kuantan, Pahang Darul Makmur
|
KSRC Sdn. Bhd.
|
|
2022
|
Consultancy Services For The Proposed Development Of Bukit Ibam Scheduled Waste Management Centre At Lot PT.355, Mukim Keratong, Daerah Rompin, Pahang
|
Bukit Ibam Recycling Sdn. Bhd.
|
|
2023
|
Environmental Compliance Audit For Gerbang Nusajaya Mixed Development, Nusajaya, Johor Darul Takzim—Proposed Main Infrastructure Works To Affordable Housing (Package 8)
|
Nusajaya Rise Sdn Bhd
|
|
2023
|
Environmental Impact Assessment (EIA)(Second Schedule) For The Proposed Development Of ‘Pusat Latihan Udara TLDM (PLUT)’ Phase 1 In Mukim Sitiawan, Manjung, Perak
|
Jabatan Kerja Raya (JKR) Malaysia
|
|
2023
|
Kajian Bagi Penggubalan Peraturan-Peraturan Kualiti Alam Sekeliling (Aktiviti Yang Ditetapkan) (Laporan Penilaian Kesan Kepada Alam Sekeliling) 20XX
|
Jabatan Alam Sekitar Putrajaya
|
|
2023
|
Proposed Development Of A Long –Term Storage Facility (LTSF) For The Neutralisation Underflow (NUF) Residue At Gebeng Industrial Estate (GIE), Mukim Sungai Karang, Kuantan, Pahang
|
Gading Senggara Property Sdn Bhd
|
|
2023
|
Environmental Impact Assessment (EIA) (First Schedule) For The Proposed Lanthanide Concentrate (LC) and Mixed Rare Earth Carbonate (MREC) Processing at Lynas Advanced Material Plant (LAMP), Gebeng Industrial Estate (GIE), Kuantan, Pahang
|
Lynas Malaysia Sdn. Bhd.
|
|
2024
|